The steps below are based on Centauri Carbon 2 Combo. For other models, skip the steps related to parts that are not installed.
| Model |
Action |
Steps to Skip |
| Centauri Carbon 2 Combo |
Follow all steps |
None
|
| Centauri Carbon 2 |
Skip lid removal step |
|
| Centauri 2 Combo |
Skip lid removal step |
|
| Centauri 2 |
Skip lid removal step |
|
If your printer has optional accessories installed, such as CANVAS or an enclosure, follow the steps related to those parts.
-
A 2.0 mm Allen key
-
New pressure sensors


https://youtu.be/TGBUPuxrx64
-
Plug in the power supply cable. Turn the power switch ON (symbol "|").
-
Remove the lid.

- Open the front door.

- On the touch screen, select Control - Homing. Wait for the homing process of the tool head to complete.


- On the touch screen, select 30 mm as the motor movement distance by 60 mm.

- Turn the power switch OFF (symbol "〇") and unplug the power supply cable.
- Release and remove the six screws securing the heated bed pallet with a 2.0 mm Allen key. Remove the PEI plate.



- Secure the pin of the mutual locking bolt with a 2.0 mm Allen key. Release and remove the collar of the mutual locking bolt with another 2.0 mm Allen key.


- Remove the other mutual locking bolts in the same way.



- Lift the heated bed. Remove the springs.


¶ Disconnect and Remove the Existing Pressure Sensors
- Unplug the extension cable of the pressure sensors. Remove the heated bed pallet.


- Tilt the heated bed and place it temporarily in the chamber.

- Remove the tape securing the pressure sensors. Keep the tape at hand as it will be reused later.

- Unplug cables of the pressure sensors.

- Release and remove the four screws securing the pressure sensor with a 2.0 mm Allen key. Remove the pressure sensor.

- Remove the other three pressure sensors in the same way.

- Get the new pressure sensors. Tighten the four screws securing the pressure sensor. Tighten the other three pressure sensors in the same way.

- Plug in the cables of the four pressure sensors.

- Secure the cables of the pressure sensors with tape.

- Lift the heated bed. Put the heated bed pallet in the installation position.

- Plug in the extension cable of the pressure sensors.

- Put the four springs in the installation position.

- Lay the heated bed down carefully. Align the mutual locking bolt with the springs.


- Tighten the six screws securing the heated bed pallet.


¶ Secure the Heated Bed and Complete Calibration
- Secure the pin of the mutual locking bolt with a 2.0 mm Allen key. Tighten the collar of the mutual locking bolt.


- Tighten the other three mutual locking bolts in the same way.

- Put the PEI plate above the heated bed.

-
Plug in the power supply cable. Turn the power switch ON (symbol "|").
-
On the touch screen, select Settings - Calibrate - Automatic leveling - Textured A-sided - Confirm.
The printer is ready for use after the automatic leveling.